Free visual guide

Asymmetric Three-Cell Network Wooden Train Track Layout

Build the Asymmetric Three-Cell Network wooden train track layout with 47 pieces. This free guide includes an exact track list and 16 visual stages.

  • Intermediate
  • 77 min
  • 47 track pieces
  • 118 × 215 cm play space

Finished build

See the whole asymmetric three-cell network first.

A large perimeter, lower return cell, and diagonal inner route.

Finished Asymmetric Three-Cell Network train tracks build

Gather the pieces

Gather 47 train track pieces.

Match the track shapes first. Exact fit can vary by brand, so compare each connection before building the full route.

PieceQuantity
Curved Switch Left5
Large Curve 4510
Ascending Track 216 × 644
Stackable Support Block 644
Middle Straight 725
Female-to-Female Adapter 542
Male-to-Male Adapter 542
Long Straight 2168
Short Straight 1083
Curved Merge Right2
Medium Straight 1442
Female Buffer Stop 543
Large Curve Right 451
Total47

Build together

Follow 16 connected stages.

Each picture keeps the route connected as it grows, so the family can see where the next track belongs.

  1. Stage 1
    Asymmetric Three-Cell Network, stage 1 of 16: Add this junction and continue both connected routes.

    Add this junction and continue both connected routes.

  2. Stage 2
    Asymmetric Three-Cell Network, stage 2 of 16: Add this junction and continue both connected routes.

    Add this junction and continue both connected routes.

  3. Stage 3
    Asymmetric Three-Cell Network, stage 3 of 16: Continue the next bend with 3 curved tracks.

    Continue the next bend with 3 curved tracks.

  4. Stage 4
    Asymmetric Three-Cell Network, stage 4 of 16: Add this raised section and its support blocks.

    Add this raised section and its support blocks.

  5. Stage 5
    Asymmetric Three-Cell Network, stage 5 of 16: Add this junction and continue both connected routes.

    Add this junction and continue both connected routes.

  6. Stage 6
    Asymmetric Three-Cell Network, stage 6 of 16: Extend the connected route with 3 straight tracks.

    Extend the connected route with 3 straight tracks.

  7. Stage 7
    Asymmetric Three-Cell Network, stage 7 of 16: Add this raised section and its support blocks.

    Add this raised section and its support blocks.

  8. Stage 8
    Asymmetric Three-Cell Network, stage 8 of 16: Finish these sidings with their buffer stops.

    Finish these sidings with their buffer stops.

  9. Stage 9
    Asymmetric Three-Cell Network, stage 9 of 16: Continue the next bend with 3 curved tracks.

    Continue the next bend with 3 curved tracks.

  10. Stage 10
    Asymmetric Three-Cell Network, stage 10 of 16: Add this raised section and its support blocks.

    Add this raised section and its support blocks.

  11. Stage 11
    Asymmetric Three-Cell Network, stage 11 of 16: Add this junction and continue both connected routes.

    Add this junction and continue both connected routes.

  12. Stage 12
    Asymmetric Three-Cell Network, stage 12 of 16: Add this raised section and its support blocks.

    Add this raised section and its support blocks.

  13. Stage 13
    Asymmetric Three-Cell Network, stage 13 of 16: Add this junction and continue both connected routes.

    Add this junction and continue both connected routes.

  14. Stage 14
    Asymmetric Three-Cell Network, stage 14 of 16: Continue the next bend with 3 curved tracks.

    Continue the next bend with 3 curved tracks.

  15. Stage 15
    Asymmetric Three-Cell Network, stage 15 of 16: Finish these sidings with their buffer stops.

    Finish these sidings with their buffer stops.

  16. Stage 16
    Asymmetric Three-Cell Network, stage 16 of 16: Close the final connection and check the complete route.

    Close the final connection and check the complete route.

Continue in 3D

Inspect the whole railway in EverPieces.

The App adds a rotatable 3D layout, closer inspection of raised routes, private progress, and the complete layout library.